INDUSTRY SOLUTIONS

CONSTRUCTION

Site Capture, Progress Documentation And Existing-Condition Coordination For Project Teams.

DISCUSS YOUR PROJECT →
CONSTRUCTION conceptual digital-capture visualization

DISCUSS YOUR PROJECT

01 / INDUSTRY SOLUTIONS

Bring The Field Into The Review.

Capture accessible site conditions and share a coordinated spatial record. Discuss survey control, capture intervals and the outputs your team needs before site work.

Use the captured record for fit-up planning, renovation and retrofit coordination. Agree on repeat progress capture and QA documentation so project teams can compare accessible conditions, discuss interfaces and retain a useful record of the work.

Bring The Field Into The Review. technical visualization

Progress Records

Document selected milestones and accessible work.

Existing Conditions

Capture the geometry relevant to upcoming work.

Field Coordination

Share a common reference with the project team.

02 / INDUSTRY SOLUTIONS

Plan The Handoff Before Capture.

Point clouds, inspection visuals and scoped BIM outputs serve different purposes. Define the required deliverables and review process before collecting data.

Plan The Handoff Before Capture. technical visualization

Scan To BIM

Coordinate model scope and intended use.

MEP Interfaces

Document visible routes and interfaces.

Closeout Records

Preserve an agreed digital record for operations.

CAPTURE / MODEL / REVIEW / DELIVER

Agree On The Next Step.

  1. DefineConfirm the physical asset, access and required outputs.
  2. CaptureSelect an appropriate method and field plan.
  3. DevelopProcess data and prepare the agreed models or records.
  4. ReviewCheck the scope and deliver with stated limitations.

Before Your Project

How often should a construction site be captured?

Choose intervals around the decisions and milestones your team needs to document. Access, safety and site readiness affect scheduling.

Can scans identify every concealed service?

No. Capture records visible, accessible conditions; hidden services require other investigation methods.

Does the project include a coordinated BIM model?

Only when specified. Agree on model elements, detail, reference control and review responsibility before capture.

LET’S PLAN YOUR CAPTURE

START WITH YOUR PROJECT.

DISCUSS YOUR PROJECT